
SECTION 9 –
MISCELLANEOUS
9-13
6. If necessary, lower the machine by rotat-
ing the corresponding Air Suspension
Valves (located on the left-hand front air
bag) in the COUNTER-CLOCKWISE
(Deflate) position.
7. Ensure the Boom Solution Valve
Switches (located on the side console)
are in the OFF position.
8. Disconnect the Solution, Foam Marker
(if equipped), and NORAC (if equipped)
Connections, ensuring not to leave the
ends in an area where they may become
damaged or contaminated.
Solution Connection
Solution Connection (Dry Mate)
-If Equipped
• Rotate the top Solution Connection Valve in the
fully CLOCKWISE (Close) position.
• Rotate the bottom Solution Connection Valve in
the fully CLOCKWISE (Close) position.
Lock Pin
(Located on the front left and
right-hand side of machine)
-Typical View
* Disengaged position shown
Air Suspension Valves
(Located on the left-hand front air bag)
-Typical View
• Left-
Hand
• Right-
Hand
Boom Solution Valve Switches
(Located on the side console)
-Typical View
Solution Connection
(Located on the front
right-hand side of machine)
-Typical View
Содержание STS12i Combo
Страница 276: ......