88
Preventive Maintenance and Installation
P/N: SM-ACP215-01-EN(AB)
Haemonetics
®
ACP-215
®
Service Manual
1. Insert the pump rotor assembly into the fixture.
Figure 20,
Figure 21,
Note: Ensure the pump rotor and the fixture are engaged by introducing the
fixture’s stud into the slit of the rotor. By design, one of the rotor rollers will be
Содержание ACP 215
Страница 10: ......
Страница 38: ......
Страница 58: ......
Страница 104: ...104 Preventive Maintenance and Installation P N SM ACP215 01 EN AB Haemonetics ACP 215 Service Manual...
Страница 126: ......
Страница 150: ......
Страница 182: ...P N SM ACP215 01 EN AB Haemonetics ACP 215 Service Manual 182 System Schematics System Schematic...
Страница 183: ...Haemonetics ACP 215 Service Manual P N SM ACP215 01 EN AB System Schematics 183 Family Tree...
Страница 184: ...P N SM ACP215 01 EN AB Haemonetics ACP 215 Service Manual 184 System Schematics Pneumatic Schematic...
Страница 186: ......