Productivity Inc – Haas CNC TL Series Lathe Operator Manual
Page 25
Power-Up Procedures
The TL Series lathe follows the same standard start-up procedures as with any other Haas
machine, and should be followed in the procedure demonstrated below:
Main Power
1.
Locate the main power switch on the back of the machine’s control cabinet, and switch it
to the “ON” position.
Power-Up Procedure
After switching the main power supply on, we need to “power-up” the Haas control. That
procedure is as follows:
1. Move the tailstock (if equipped) all the way to the far right of the limits of the machine,
and leave the clamps on the tailstock loose. This will provide the saddle enough room to
reference itself. CAUTION: the control does not know where the tailstock is, and there is
a chance to crash if the tailstock is not in the home position!
2.
Visually verify that all of the machine’s ways are clean and free of dirt, and any moving
parts of the machine are clear of chips, coolant, etc… and verify that there is sufficient air
pressure (80 psi) to the machine
3.
Press the Green POWER ON button located on the upper left corner of the Haas control.
The machine will take a couple of minutes to load its software.
4.
The machine is now “Powered-On”
Содержание TL Series
Страница 40: ...Productivity Inc Haas CNC TL Series Lathe Operator Manual Page 38 TL Series Training Part ...
Страница 62: ......
Страница 63: ...ES0609 rev D 4 09 1 Intuitive Programming System Walk Through For Lathes ...
Страница 102: ......
Страница 107: ...ES0666 rev D 09 09 5 Sample Tool Setup Screens ...