background image

44

Replacement Batteries

RB500 – The standard 12 volt, 7.0 ampere-hour, maintenance-free battery for all GTO/PRO gate operators. This
is the only battery approved for use with GTO gate operators.  Battery life 3 to 5 years.

RB422 –The 12 volt, 1.2 ampere-hour version for use with the Bulldog Pedestrian Gate Lock.

Transformers for charging the gate operator battery

RB566 – Standard 18 volt, 20 VA, AC transformer for GTO/PRO 1000 series gate operators with serial numbers.

Bulldog Replacement Charger

RB421 – Standard 12 volt DC charger (not shown) for maintaining battery included with the Bulldog Pedestrian
Gate Lock.

ACCESS -ories

GTO, Inc. gate operator accessories are warranted by the manufacturer against defects in materials and
workmanship for a period of one year, unless otherwise stated, from the date of purchase provided
recommended installation procedures have been followed. Warranty is considered void if damage was due
to improper installation or use, connection to an improper power source, or was caused by lightning, wind,
fire, flood, insects, or other natural agent.

Operator Solar Panel (FM123 )

 - Improved, Amorphous Silicon

This 10 watt solar panel is a battery charger for use with GTO/PRO Low Voltage Automatic Gate Operator
systems. Particularly suited for remote installations, the solar panel comes with tubular steel support, mounting
clips, wire connectors, and 8 ft. of low voltage wire (for longer lengths, see RB509).  All GTO low voltage
operators are pre-wired for solar panels.  Installation in some regions of the world will require multiple panels for
adequate charging power. Recommended for GTO/PRO 2000/2200, GTO/PRO SL-1000/SL-1200.

Operator Solar Panel (FM122 ) 

Improved Amorphous Silicon

The 5 watt solar panel is a battery charger for use with GTO/PRO Low Voltage Automatic Gate Operator
systems. Particularly suited for remote installations, the solar panel comes with tubular steel support, mounting
clips, wire connectors, and 8 ft. of low voltage wire (see Low Voltage Wire for longer wire).  All GTO low volatge
operators are pre-wired for solar panels.  Installation in some regions of the world will require multiple panels for
adequate charging power. Recommended for GTO/PRO 1000, GTO/PRO 1200 and the GTO Bulldog Gate
Lock
.

Dual gate installations require minimum of two (2) 5 watt solar panels for adequate charging power.

26 Amp Hour Battery Kit (FB296)

This large 12 volt, 26 ampere-hour, maintenance-free battery is for the
GTO/PRO  gate operators. It will supply additional power for increasing the
number of open and close cycles. The kit comes  with the battery and wiring
harness for easy installation.  Battery life 3 to 5 years.

GTO

 

NEMA Box (FM317)

GTO's NEMA 4X rated weatherproof box is large enough (14" W x 6" D x 16" H) to
accommodate all add-on items necessary for custom gate operator installations. It is made of fire
retardant ABS plastic and comes with a heavy duty 14 gauge steel backing plate for mounting
accessories. The unique, lockable cover (use the Master

®

 Pin lock RB975 for added security)

can be completely removed for easier access during installation and service.

The NEMA box is standard on all GTO/PRO AC powered operators.

Содержание SL-5100

Страница 1: ...t meets and exceeds the requirements of UL 325 the standard which regulates gate operator safety as established and made effective March 1 2000 by Underwriters Laboratories Inc WARNING READ ALL INSTRU...

Страница 2: ...icted access locations not servicing the general public in which unauthorized access is prevented via supervision by security personnel GTO PRO 1000 series automatic gate operators are intended for us...

Страница 3: ...vity page 20 Connecting the Transformer page 20 Control Board Settings page 23 DIP Switches page 23 Potentiometers page 24 Setting Your Personal Transmitter code page 25 Mounting the Receiver page 26...

Страница 4: ...TO ENSURE THE SAFE SYSTEM DESIGN INSTALLATION AND USE OF THIS PRODUCT The precautions and warnings in this manual are identified with this warning symbol The symbol identifies conditions that can res...

Страница 5: ...sed with the system 4 Review the operation of the system to become familiar with its safety features Understand how to manually open and close the gate by disconnecting the operator see page 1 5 This...

Страница 6: ...tire gate operator system including disconnecting the operator for manual operation of the gate 2 Attach the warning signs included to each side of the gate to alert public of automatic gate operation...

Страница 7: ...ading edge bottom edge and post mounted both inside and outside of a vehicular swing gate system B A hard wired contact sensor shall be located and its wiring arranged so that the communication betwee...

Страница 8: ...perator unless you can see it and can determine that its area of travel is clear of people pets or other obstructions 8 It is your responsibility to make sure that the installer posted warning signs o...

Страница 9: ...ate see page 7 for details Warning signs alert people of automatic gate operation and are required when installing the GTO PRO 1000 and series gate operators Furthermore a walk through gate must be in...

Страница 10: ...ow children to operate gate or play in gate area 3 This gate is for vehicles only Pedestrians must use separate entrance warning labels 2 installed on each side of operator housing RB2000 Maximum Gate...

Страница 11: ...1 2 to 111 2 Operator length with push pull tube fully retracted is 333 4 mounting point to mounting point Adjustable auto close timer OFF to 120 s inertia and obstruction sensitivity using three 3 po...

Страница 12: ...5 16 x 1 3 4 Bolt 1 3 8 x 2 Bolt 1 3 8 x 3 Bolt 2 3 8 x 8 Bolt 4 8 Nylon Cable Tie 14 3 8 Washer 9 3 8 Lock Washer 7 5 16 Washer 1 3 8 Nut 7 5 16 Nut 1 Hardware Gate Opener 1 Gate Bracket 1 4 1 2 x 4...

Страница 13: ...Installation of the Positive Stops for more information Additional low voltage wire 16 gauge will be needed length depends upon the distance between the transformerpowersupplyandthecontrolbox Seepage...

Страница 14: ...tep 2 The fence post must be strongly secured in the ground with concrete so it will not twist or flex when the operator is powered It is important to position the operator near the centerline of the...

Страница 15: ...e post bracket assembly using the 3 8 x 2 bolt in the center holes as shown Fasten a 3 8 washerandnutontheendof the bolt DO NOT overtighten nut because the post pivot bracket will need to be adjusted...

Страница 16: ...is aligned with the rest of the assembly center hole should already have bolt through it Flipping the Post Pivot Bracket gives more position options After verifying that you have complied with the 4 1...

Страница 17: ...meter or 6 square should be made of metal not wood On round posts of 6 diameter or larger the post pivot bracket may not be needed for the installation Just use the two post brackets by themselves 4 1...

Страница 18: ...ate required but not supplied Cut off excess bolt with hack saw or bolt cutters FRONT VIEW SIDE VIEW FRONT VIEW SIDE VIEW NOTE if the fence post has a diameter greater than 6 it will be necessary to u...

Страница 19: ...e sure to support operator Installtheclosedpositionstopplateontheendofthegate frame at mid height Extend the stop plate to make contact with the fence post at that position NOTE Use appropriate hardwa...

Страница 20: ...or should be installed on the gate and the open and closed position stops should be in place Check List The gate is plumb level and swings smoothly on its hinges After measuring with the 4 1 2 x 4 1 2...

Страница 21: ...ove the ground to protect it from rain splash snow etc and at least 3 feet from an ac power source to prevent electrical interference RED wire to POSITIVE terminal BLACK wire to NEGATIVE terminal RED...

Страница 22: ...decrease the degree of gate closure move the stroke adjustment knob away from the gate bracket Fig B Figure A Figure B Moving knob toward the gatebracketincreasesgate closure Moving knob away from th...

Страница 23: ...easure the distance from this electrical outlet to the control box following the path where the wire will be laid After you have measured how much wire is needed cut it to the appropriate length This...

Страница 24: ...ockout Never splice wires together Splicing permits corrosion and seriously degrades the wire s ability to carry an adequate current Correct Wrong Wrong Wire Terminal Block Terminal Block Terminal Blo...

Страница 25: ...Step 26 Strip 1 2 off the ends of the low voltage wire and attach ends to the transformer terminals red lead to RED black lead to BLK A dab of household petroleum jelly on each terminal will help prev...

Страница 26: ...on on pages 30 31 NOTE The direction a gate opens is determined by standing inside the property and facing toward the gate SNGL DUAL Set to SNGL for a single gate leaf factory setting DUAL for dual ga...

Страница 27: ...stops and reverses The gate will exert minimum force before obstructing when set to MIN When set to MAX the operator will exert maximum gate force before obstructing i e the operator will require gre...

Страница 28: ...nsmitter DIP switches each of which can be placed in three different positions 0 DO NOT set all the switches in the same position such as all all 0 or all Once the DIP switches have been set to a pers...

Страница 29: ...post doing so will decrease signal range DO NOT overtighten the mounting screws the receiver housing could be warped and the weather seal damaged The receiver range can vary from 50 to 100 feet depend...

Страница 30: ...Laboratories safety standard for gate operators Review page 4 for information about mounting requirements for safety edges contact sensors and photoelectric sensors non contact sensors Refer to the se...

Страница 31: ...tobeam EMX Industries Inc IRB 4X NOTE This is not an exhaustive list of compatible safety devices Although GTO strongly recommends the use of safety devices we do not endorse any specific brand names...

Страница 32: ...nd the gate operator will fail to operate BLU blue used with GRN green Functions as a normally open contact This pairing is typically used for free entry and free exit devices First contact will open...

Страница 33: ...ove the post pivot bracket be sure one of the post bracket holes is aligned with the rest of the assembly centerholeshouldalreadyhaveboltthroughit Flipping the Post Pivot Bracket gives more position o...

Страница 34: ...er adjustment is necessary If the motor strains too long against the stop plate the fuse on the control board for the FIRST OPERATOR terminal will be blown This blade style 15 ampere fuse sold by most...

Страница 35: ...for voltage If the terminal block shows no voltage look for broken or spliced wires Check the Red STATUS LED on the Control Board IF THE LED IS ON but the unit is not working 1 Check the battery in yo...

Страница 36: ...knob The GTO Inc Technical Service Department is open Monday Thursday 7 30 A M 5 30 P M and Friday 8 00 A M 12 00 P M Eastern Time Fax 850 575 8950 Web site www gtoinc com E Mail techsupport gtoinc co...

Страница 37: ...year warranty period the operator will be repaired or replaced at the manufacturer s option at no charge to the customer if returned freight prepaid to GTO Inc 3121 Hartsfield Road Tallahassee Florida...

Страница 38: ...ance the operator may operate the gate for a while but eventually the unit will become nonfunctional To prevent this problem we suggest the following installation method A The simplest solution is to...

Страница 39: ...olt 2 3 8 x 8 Bolt 4 8 Nylon Cable Tie 6 3 8 Washer 9 3 8 Lock Washer 7 5 16 Washer 1 3 8 Nut 7 5 16 Nut 1 Hardware Actual Size GTO Operator 1 Gate Bracket 1 Post Pivot Bracket 1 Post Bracket 2 Closed...

Страница 40: ...to Open Installation starting on page 30 Illustration B Step D 1 Turn back to page 11 and repeat Steps 1 through 11 to install the second unit Step D 2 Install open position stops for both gates See...

Страница 41: ...the Second Operator to the Control Board Step D 5 Attach the closed position stop plate vertically to the inside bottom of the gate that will close first When the gate is in closed position the posit...

Страница 42: ...Setting the Control Board for Dual Gate Installations DIP Switches The Control Board DIP switches must be set to accommodate your particular type of installation Since the SNGL DUAL SEQ1 and SEQ2 DIP...

Страница 43: ...PERATORS OPEN SIMULTANEOUSLY SECOND OPERATOR CLOSES FIRST SEQ1 OFF SEQ2 OFF If both SEQ1 and SEQ2 are set to OFF the FIRST OPERATOR and SECOND OPERATOR open simultaneously The SECOND OPERATOR will clo...

Страница 44: ...41 AccessoriesfromGTO Inc Available through your dealer AUTOMATIC GATE OPERATORS...

Страница 45: ...es not included Can also accommodate most garage doors and other gate openers If used as a wired keypad 16 gauge standard low voltage direct burial wire will be required see RB509 GTO Bulldog Pedestri...

Страница 46: ...or walls Splice Kit Direct Burial RB708 When direct burial wire running below ground needs to be spliced the RB708 splice kit must be used SpliceKit Above Ground RB707 For providing secure and moistu...

Страница 47: ...ed for solar panels Installation in some regions of the world will require multiple panels for adequate charging power Recommended for GTO PRO 2000 2200 GTO PRO SL 1000 SL 1200 Operator Solar Panel FM...

Страница 48: ...control board terminals ___ All warning signs and labels were installed as specified in the IMPORTANT SAFETY INSTRUCTIONS ___ Safety instructions were reviewed with the customer ___ A copy of the IMP...

Отзывы: