GST-IFP8 Intelligent Fire Alarm Control Panel
Installation and Operation Manual
Page 16
FAR:OK FPE:DIS OTS:OK 20:44:30
*******************************************
*WORKING STATE SETUP*
1.COMMISSION
2.MONITORING
Fig. 4-9
Step 2: Reboot the FACP while it
’s in commission state. The FACP will automatically
register devices. Please check the number, address and working state of the registered
devices in according to engineering requirement, and remove any problem.
4.6 Device Definition
Please define devices and C&E equations by the software GstDef2.1 Defining Tool
through a PC, and download the definitions to the FACP. Refer to
GstDef2.1 Defining
Tool User
’s Manual
for detailed operation.
4.7 Field Device Commission
After connection, definition and download of device and C&E equations, you can power
up the FACP and start commission. The following steps are for reference.
1
Complete the labels of zone indication panel.
2
Test all the detectors and make sure their positions are correct.
3
Check all device definition, and modify the improper definitions.
4
Check al l C&E equations, modify improper equations, and test automatic action of
the system by C&E equation.