27
Dry Run
1.
From the MAIN Screen. Select the SHOT FLOW button. From the SHOT FLOW screen, do the
Material Pump Servo Start Up Sequence
(if required)
.
2.
Under PUMP COMMANDS press the RETRACT button.
3.
Set the SHOT SIZE for a large shot.
See adjusting the Shot Size.
4.
Press the SHOT button.
5.
Press and release the start device (START CYCLE button or foot switch). Machine takes one
cycle and stops, depending on flow rate selected.
6.
Press and hold the start device. Machine cycles continuously.
7.
Press the OFF button. The machine stops.
8.
Press the EXTEND button. The servo extends the pumps. Then press the RETRACT button.
12.
Press the CONT button.
13.
Press and release the start device. The machine cycles continuously.
14.
Press the STOP button. The machine stops cycling.
15.
Press the RETRACT button. The macine retracts.
16.
Press the HOME button. Machine will home and is now ready for next function.
A Dry Run demonstrates the machine’s controls and dispensing steps. It also verifies
that the machine is working correctly before loading material.