Initial Startup
The machine is completely factory assembled and tested. However, due to packing convenience, some
on-site reassembly may be required.
1.
Close all ball valves and close all other valves within feed systems unique to machine.
NOTE:
Steps 2-4 are only for machines with air
.
2.
Place an in-line regulator and shutoff valve between the machine and the air supply.
3.
Connect a 1/2” or larger diameter air supply line to the air inlet for tank agitators.
4.
Increase the pump air pressure to 20 psi and then reduce it to 0 psi. This will signal any air leaks.
5.
Connect material hoses to the proper pump outlets. Secure remaining ends at dispense valve.
If equipped with mild steel and stainless steel pump assemblies,
make sure the hose fitting material matches the pump material.
The pumps and hoses are color coded at the factory.
When connecting hoses, match hose colored tape to the pump assembly
colored tape for proper installation.
6.
Lubricate the pump seal housing with grease.
7.
Connect the required electrical power to the machine as indicate on the machine serial number
plate and logic drawing enclose.
8.
Check the tightness of all fittings before proceeding.