
Chapter 8 - Operation -
89
G8 Super Cruiser Operator’s Manual MY19 - REV 0
EZ Control External Water
Delivery Station
The external water delivery station allows several
filling functions of the sprayer to be performed
simultaneously.
1. With fresh water entering the system as per ‘Main
Tank Fill’ instructions, ensure that all ball valves,
including the ‘Main tank fill’ ball valve, on the
external water delivery station are turned to OFF.
2. Turn the desired function ON by selecting the
appropriate ball valve as labelled.
3. When the required amount of water has been
transferred, turn the appropriate valve to OFF.
4. When all functions have been performed, turn the
fresh water pumping system OFF.
Rinse Water Tank Fill
The rinse water tank holds approximately 500 L.
Make sure this tank always has sufficient water in it
in case a chemical accident occurs and rinse water
is needed to wash chemical from any contaminated
persons, clothing or components.
To fill the rinse water tank from the fresh water
supply via the quick-fill and fill station:
1. Start by ensuring that all ball valves on the fill
station are turned off.
2. Lift the ‘Rinse tank fill’ red handle on the EZ
control 3-way ball valve to the vertical position.
This is the ON position.
3. Connect the fresh water fill hose to the quick-fill
coupling.
4. Operate the fresh water pumping system (make
sure pressure does not exceed 75 PSI). There
should now be flow transferring to the rinse
water tank.
5. When the required amount of water has been
transferred to the rinse water tank, stop the flow
by turning off the external water supply and shut
the rinse water tank fill valve by flipping it back
down.
Tank Filling
Left:
Remote fill
3” inlet mounted
to chassis on left
hand side before
front axle.
Right:
Remote fill
3” inlet mounted
to right hand side
Pod.
Remote Fill Points - 3”
There are two options for the 3” remote fill points.
One is located on the front right hand side of the
chassis just in front of the front axle. The other is
located on the left hand side of the chassis and is
mounted to the side of the Pod.
These fill points go straight into the main tank,
bypassing the control Pod, in doing so, the tank rinse
and or rinse tank filling can not be operated when
filling from these points.
The fill times are faster using these points and they
give the option to remote fill from a Goldacres
BatchMate unit with pre-mixed chemical straight into
the main tank.
Содержание Super Cruiser G8
Страница 1: ...Super Cruiser G8 Operator s Manual MY19 GA8700989 REV 0 APR 2019 FROM SERIAL 202114 ...
Страница 12: ...8 Chapter 2 Safety G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 18: ...14 Chapter 3 General Information Specs G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 34: ...30 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 Power Distribution Box Fuse Box Layouts ...
Страница 43: ...Chapter 4 Cabin 39 G8 Super Cruiser Operator s Manual MY19 REV 0 CANtrak System Parameters Monitored ...
Страница 58: ...54 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 74: ...70 Chapter 7 Pre Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 104: ...100 Chapter 8 Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 210: ...www goldacres com au ...