
Chapter 12 - Optional Accessories -
183
G8 Super Cruiser Operator’s Manual MY19 - REV 0
3. Once the target volume has been reached, an alarm will activate. Stop water flow and press ‘CLR’ to silence
the alarm.
4. To reset the actual volume, press and hold ‘CLR’
5. If at any stage the target volume becomes incorrect, press ‘CLR’ once. This will reset the target volume to the
maximum value you programmed in when setting up the console.
6. When the operation is complete, press the up and down arrows simultaneously to turn the console off.
Flow Meter Operation
1. Press ‘PRO’ to switch display screen on
2. To begin measuring flow into the sprayer tank, ensure ‘>L’ next to the target volume is flashing. You can now
apply flow through the fill system. The actual volume on the bottom line should begin increasing.
Note: If ‘>L’ is not flashing when the TeeJet electric ball valve is fitted, the ‘Actual’ volume will not count
Fill Flow Meter - 70 Series
Содержание Super Cruiser G8
Страница 1: ...Super Cruiser G8 Operator s Manual MY19 GA8700989 REV 0 APR 2019 FROM SERIAL 202114 ...
Страница 12: ...8 Chapter 2 Safety G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 18: ...14 Chapter 3 General Information Specs G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 34: ...30 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 Power Distribution Box Fuse Box Layouts ...
Страница 43: ...Chapter 4 Cabin 39 G8 Super Cruiser Operator s Manual MY19 REV 0 CANtrak System Parameters Monitored ...
Страница 58: ...54 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 74: ...70 Chapter 7 Pre Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 104: ...100 Chapter 8 Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 210: ...www goldacres com au ...