
114 - Chapter 9 - Boom
G8 Super Cruiser Operator’s Manual MY19 - REV 0
To lower the outer boom, remove
shims from the lower pivot.
To raise the outer boom,
remove shims from the top pivot.
D
E
F
C
B
A
3
2
1
5
C
D
4
6
7
8
A
B
Kg
DEBUR ALL EDGES
DRG. STANDARD
/PRACTICE
AS 1100
REV
21/10/2015
Drawing Checked:
FINISHED WEIGHT:
Approved
Surface Finish:
THIS DRAWING REMAINS THE PROPERTY
OF GOLDACRES TRADING PTY LTD AND IS
SUBJECT OF COPYRIGHT
UNTOL. DIMENSIONS
OPEN DIM ± 0.20
ONE DEC. PL. ± 0.10
TWO DEC. PL. ± 0.05
ANGULAR ± 0.50°
UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE
IN MILLIMETRES
23/03/2010
DATE EDITED:
ECN NO.
NAME/DATE
CHANGE
REV NO
David
C.Turner
Centre Section Assembly, G8
Main Centre Assembly G8 MY15 - GA4907475
1-3 MORANG CR
MITCHELL PARK 3352
PH: 03 53426399
FAX: 03 53426308
Drawn By:
Material
:
DO NOT SCALE DRAWING
GOLDACRES
TITLE:
DWG NO.
SCALE:1:7
SHEET 1 OF 1
A3
4
3
2
1
Boom Adjustment - 36-42 m
OUTER BOOMS
• The height of the outer booms in the working
position are adjusted by adding or removing shims
at the fold hinge.
• The fold hinge mounts are assembled in
manufacturing with 6-7 shims at the upper and
lower bearing blocks.
• If the outer boom hangs lower than the inner
boom, remove shims from the upper mount until
the booms are level. If the outer boom is too
high remove shims from the lower bearing block.
Re-tension the retaining bolts to 65 Nm when all
adjustments are complete.
For 36 m booms:
1 shim added = 20-30 mm change at boom end
For 42 m booms:
1 shim added = 30-40 mm change at boom end
Содержание Super Cruiser G8
Страница 1: ...Super Cruiser G8 Operator s Manual MY19 GA8700989 REV 0 APR 2019 FROM SERIAL 202114 ...
Страница 12: ...8 Chapter 2 Safety G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 18: ...14 Chapter 3 General Information Specs G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 34: ...30 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 Power Distribution Box Fuse Box Layouts ...
Страница 43: ...Chapter 4 Cabin 39 G8 Super Cruiser Operator s Manual MY19 REV 0 CANtrak System Parameters Monitored ...
Страница 58: ...54 Chapter 4 Cabin G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 74: ...70 Chapter 7 Pre Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 104: ...100 Chapter 8 Operation G8 Super Cruiser Operator s Manual MY19 REV 0 ...
Страница 210: ...www goldacres com au ...