Important!
The test will not be run immediately on a luminaire if:
•
Luminaire is currently in the emergency mode
•
Luminaire is in the emergency mode lock state
•
Luminaire is in the rest mode
•
Luminaire battery is insufficiently charged
In these cases, the test will be postponed and run as soon as possible (e.g. the autonomy test will be
run when the battery is charged).
Important!
The luminaire brightness will not change if:
•
Luminaire is currently in the emergency mode
•
Luminaire is in the rest mode
•
Functional/ autonomy test is run on the luminaire
•
Luminaire is in the extended emergency mode
In these cases, the test will be queued and run as soon as possible (e.g. the autonomy test will be run
when the battery is charged).
Important!
If the luminaire power supply is turned off within 15 minutes of lock activation, the luminaires go to the
rest mode.
PROGRAMMING THE SUPERVISION (NIGHT) LIGHTING FUNCTION
The supervision (night) lighting and luminaire brightness adjustment are programmed during the
system commissioning in the building
by the ES-SYSTEM service.
GENERATING AND PRINTING THE TEST REPORTS
The test reports are generated and printed in the “Reports” screen.
Important!
Each reports presents the state of the whole system after the test. This means that the devices not
included in the test are also included in the report.
45
Содержание Vertex PN8100102
Страница 1: ...OPERATION AND MAINTENANCE MANUAL ...
Страница 30: ...Example of DALI 2 sensor configuration motion sensor 32 ...
Страница 32: ...Example of VERTEX Action block configuration 1 2 3 34 ...
Страница 37: ...39 ...