www.geosatpro.com
Toll Free 888-483-4673
39
The unique slots in the post tube allows
the post to be leveled or made plumb
in any installation position. Center the
bubble in the level then tighten the 4
flange bolts to secure the post. It is
very important to make sure that the
post is perfectly plumb (level on all
Insert the Bubble Level into the top of the
post. Be sure that it is seated level with
the top edge of the post.
Not Level Level
The most critical step to providing a
stable mounting platform for the dish
is the installation of the Tripod Support
Legs. If the lag bolts cannot be secured
directly into a stud or rafter, the legs
should be secured into plywood sheeting
with either a backing a toggle bolt or to
a 2 x 4” that is lag bolted between the rafters or studs.
Remember to use silicone or other sealant on any roof or wall
penetration. The legs are required to support the wind load on the
universal post mount. Failure to install the tripod support legs will
result in collapse of the post during moderate winds. The post is
not designed to solely support the dish. If you hire a local installer,
please be sure that the legs are installed.
sides). If the post is not exactly plumb, the elevation scale will not
be accurate and it will be very difficult to locate the satellites and
properly tune the dish for reliable reception.
Glorystar will charge back contracted professional
installers if mast support tripod legs are not installed.
Level and Secure Post
Содержание DVR1100c
Страница 1: ......
Страница 5: ...www geosatpro com Toll Free 888 483 4673 Important Safeguards...
Страница 10: ...B Gohl Satelliteav com Remote Control Unit...
Страница 60: ...B Gohl Satelliteav com 58 Cut Here...