Operator's Manual
Sixth Edition • Sixth Printing
Operating Instructions
52 Z-80/60
Part No. 226482
Installation of Padding
1
Install the 2 pieces of padding on the platform
rails. Position the padding to protect the panels
from contact with the platform rails.
Installation of Strap
1
Open the clamp and install it around a vertical
platform rail tube.
2
Insert a bolt with a washer through one side of
the clamp.
3
Install the strap assembly end plate onto the
bolt.
4
Insert the bolt through the other side of the
clamp.
5
Secure with a washer and a nut. Do not
over-tighten. The strap assembly end plate
should be able to slide on the platform rail.
Panel Cradle Operation
1
Secure both panel cradles to the platform.
2
Place the load so that it rests in both panel
cradles.
3
Center the load on the platform.
4
Secure the load to the platform using the strap.
Tighten the strap.
rubber
bumper 1
decal
hook piece
panel
cradle
base
U-bolt
mounting
slots
rubber
bumper 2
padding
clamp
hook
Содержание Z-80/60
Страница 8: ...Operator s Manual Sixth Edition Sixth Printing Personal Safety 6 Z 80 60 Part No 226482...
Страница 10: ...Operator s Manual Sixth Edition Sixth Printing Personal Safety 8 Z 80 60 Part No 226482...
Страница 43: ...Sixth Edition Sixth Printing Operator s Manual Inspections Part No 226482 Z 80 60 41...
Страница 65: ...Distributed By www genielift com...