Section 3 • Scheduled Maintenance Procedures
3 - 14
GR-20J • GR-26J
Part No. 227656
September 2016
CHECKLIST
B
PROCEDURES
B-6
Test the Key Switch
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper key switch action and response is essential
to safe machine operation. The machine can be
operated from the ground or platform controls and
the activation of one or the other is accomplished
with the key switch. Failure of the key switch to
activate the appropriate control panel could cause
a hazardous operating situation.
1 Turn the key switch to platform control and pull
out the red Emergency stop button to the on
position at both the ground and platform
controls.
Note: Rotate the red Emergency Stop button at
platform control one quarter turn in a clockwise
direction to restore the power supply. The red
Emergency Stop button returns automatically to
the out, or on position.
2 Check the machine functions from the
ground
controls.
Result: The machine functions should not
operate.
a
platform control
b
machine switch off
c
ground control
3 Turn the key switch to ground control.
4 Check the machine functions from the
platform
controls.
Result: The machine functions should not
operate.
5 Turn the key switch to the off position.
6 Test the machine functions from the ground and
platform controls.
Result: The machine functions should not
operate.
b
a
OFF
c
Содержание GR-26J
Страница 12: ...September2016 GR 20J GR 26J Part No 227656 This page intentionally left blank ...
Страница 75: ...Section 4 Repair Procedures Part No 227656 GR 20J GR 26J 4 29 September2016 This page intentionally left blank ...
Страница 109: ...Section 6 Schematics Part No 227656 GR 20J GR 26J 6 3 September2016 ECM Pin out Legend ...
Страница 118: ...Section 6 Schematics 6 12 GR 20J GR 26J Part No 227656 September2016 This page intentionally left blank ...