Date: 2021-08-17
Copyright of the European Union is effective (Copyright EU) (c) 2021 GENEREX Systems GmbH, Hamburg, Germany, All rights reserved
TEL +49(40)22692910 - EMAIL [email protected] - WEB www.generex.de (This and all other product datasheets are available for download.)
50
The following functions represent typical menu entries:
Custom Test
The Custom Test is an on-battery function test using a self-defined time in minutes.
Battery Test
The battery test checks whether the UPS works properly and the batteries take over. This test usually takes about 15 seconds.
This test will not show how long the batteries will be able to take over.
Full Test
The Full Test will test the batteries until they are depleted. This test can take a long time depending on power and load. The
CS141 also accurately measures and determines the runtime under load. Please note UPS systems require stable load of at
least 25% to perform a full test.
Self test
With this test, the UPS checks its own electrical functionality
Note:
In some cases, a UPS command may seem to fail or an error message may appear. This behaviour is based on the fact a UPS
receives and confirms a command, but without doing it until pre-conditions are fulfilled. As an example, there must be a
minimum charge for a particular battery test - otherwise the UPS returns an error message as a result. This result will be logged
accordingly as "error". In reverse cases, it is possible the UPS sends a positive feedback despite errors but indicates an error on
the front display itself.
Due to these facts in sometimes the behaviour of a UPS system is unique and for some cases unfortunately not predictable.