13. Operating Instructions
2-50
Carefully operate the machine not to allow it to get mired
in mud. If the machine is mired in mud, the machine can
escape as follows:
13-13-1. If only one track is mired in the mud
If only one track is mired in the mud, place the bucket on
the muddy side, lift the track above the ground, lay a log or
a wood block under the track shoe, and raise the bucket to
escape.
IMPORTANT
When lifting the machine above the ground with the
boom or the arm, press on the ground with the bottom
of the bucket. (Do not press on the ground with the
bucket teeth.)
In doing this, the angle between the boom and the arm
should be 90 degrees to 110 degrees.
The same procedure described above should be uti-
lized when the bucket is in the reverse position.
13-13-2. If both tracks are mired in the mud
If both tracks are mired in the mud, lay a log or a wood
block under the track shoes in the same manner as men-
tioned above, dig the bucket into the solid ground, retract
the arm just as when excavating, and push the travel le-
vers forward to escape from the mud.
13-13. Escaping from the mud
000437-00X
000438-00X
Содержание Z17 GEN:2
Страница 28: ...MEMO 1 16 Courtesy of Machine Market...
Страница 40: ...MEMO 1 28 Courtesy of Machine Market...
Страница 41: ...2 1 OPERATION Courtesy of Machine Market...
Страница 128: ...MEMO 2 88 Courtesy of Machine Market...
Страница 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Страница 188: ...MEMO 3 60 Courtesy of Machine Market...
Страница 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Страница 192: ...MEMO 4 4 Courtesy of Machine Market...
Страница 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Страница 196: ...MEMO 5 4 Courtesy of Machine Market...
Страница 197: ...6 1 NOTES Courtesy of Machine Market...
Страница 198: ...6 2 28 Maintenance Log Maintenance log Date Machine hours Service performed Courtesy of Machine Market...
Страница 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Страница 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Страница 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Страница 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Страница 203: ...29 Notes 6 7 Courtesy of Machine Market...
Страница 204: ...29 Notes 6 8 Courtesy of Machine Market...
Страница 205: ...29 Notes 6 9 Courtesy of Machine Market...
Страница 206: ...MEMO 6 10 Courtesy of Machine Market...
Страница 207: ...Courtesy of Machine Market...