13. Operating Instructions
2-44
Do not use the implement's swing force
Do not level the ground or break down a wall by the use of
swing force, and do not dig the bucket teeth into the
ground while swinging. Doing these may cause the imple-
ment to be damaged.
Do not use the implement's travel force
Do not excavate the ground by the use of travel force with
the bucket teeth in contact with the ground. Doing this may
cause excessive force to be imposed on the rear of the ma-
chine, shortening the machine life.
Take care not to operate the hydraulic cylinder to
the stroke end
Operating the hydraulic cylinder to the stroke end may im-
pose an undue force on the stopper in the hydraulic cylin-
der, shortening the implement life. Operate with a small
safety margin.
Do not operate the implement by the using the
dropping force of the bucket
Do not excavate the ground by using the dropping force of
the bucket as a pickaxe or pile driver. Doing this may cause
excessive force to be imposed on the rear of the machine,
shortening the machine life and possibly causing a serious
accident.
13-10. Precautions for operating the implement
• Do not operate the control levers while traveling.
Stop traveling first and then operate the imple-
ment.
• Do not operate the implement on any rocky sur-
face.
000420-00X
000421-00X
000422-00E
000423-00X
Содержание Z17 GEN:2
Страница 28: ...MEMO 1 16 Courtesy of Machine Market...
Страница 40: ...MEMO 1 28 Courtesy of Machine Market...
Страница 41: ...2 1 OPERATION Courtesy of Machine Market...
Страница 128: ...MEMO 2 88 Courtesy of Machine Market...
Страница 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Страница 188: ...MEMO 3 60 Courtesy of Machine Market...
Страница 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Страница 192: ...MEMO 4 4 Courtesy of Machine Market...
Страница 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Страница 196: ...MEMO 5 4 Courtesy of Machine Market...
Страница 197: ...6 1 NOTES Courtesy of Machine Market...
Страница 198: ...6 2 28 Maintenance Log Maintenance log Date Machine hours Service performed Courtesy of Machine Market...
Страница 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Страница 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Страница 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Страница 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Страница 203: ...29 Notes 6 7 Courtesy of Machine Market...
Страница 204: ...29 Notes 6 8 Courtesy of Machine Market...
Страница 205: ...29 Notes 6 9 Courtesy of Machine Market...
Страница 206: ...MEMO 6 10 Courtesy of Machine Market...
Страница 207: ...Courtesy of Machine Market...