14. Transportation
2-73
Suspend the machine on level ground as follows:
1) Swing the upper structure so that the blade is behind
the operator’s seat.
2) Raise the blade to the highest limit.
3) Extend the hydraulic cylinders of the front implement
(except for the boom swing cylinder) to the maximum.
4) Stop the engine, and make sure that nothing is left
around the operator's seat before leaving the machine.
5) Put a slingbelt (or a wire rope) through the hole in the
arm illustrated in the figure on the right and install
shackles in the right and left holes in the side plate of
the blade on the rear side, then securely fasten the
slingbelt to the shackles.
Note:
The length of sling belt (or wire rope) is as follows :
6) Suspend the machine above the ground, wait until the
machine is stable and then suspend it slowly.
IMPORTANT
Set each lock lever at the lock position.
Shipping weight:
A
B
Length
in. (m)
78.7 (2.0)
157.5 (4.0)
Number of sling
belts / machine
1
2
lbs. (kg)
Machine with rubber crawler
3671.3 (1665)
Front side
Rear side
A
Shackle
B
020336-00E
Содержание Z17 GEN:2
Страница 28: ...MEMO 1 16 Courtesy of Machine Market...
Страница 40: ...MEMO 1 28 Courtesy of Machine Market...
Страница 41: ...2 1 OPERATION Courtesy of Machine Market...
Страница 128: ...MEMO 2 88 Courtesy of Machine Market...
Страница 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Страница 188: ...MEMO 3 60 Courtesy of Machine Market...
Страница 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Страница 192: ...MEMO 4 4 Courtesy of Machine Market...
Страница 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Страница 196: ...MEMO 5 4 Courtesy of Machine Market...
Страница 197: ...6 1 NOTES Courtesy of Machine Market...
Страница 198: ...6 2 28 Maintenance Log Maintenance log Date Machine hours Service performed Courtesy of Machine Market...
Страница 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Страница 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Страница 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Страница 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Страница 203: ...29 Notes 6 7 Courtesy of Machine Market...
Страница 204: ...29 Notes 6 8 Courtesy of Machine Market...
Страница 205: ...29 Notes 6 9 Courtesy of Machine Market...
Страница 206: ...MEMO 6 10 Courtesy of Machine Market...
Страница 207: ...Courtesy of Machine Market...