13. Operating Instructions
2-67
Precautions
• Make sure the P.T.O. selector valve is in the double act-
ing position.
Refer to Section "13-22-1. Description of stop valve,
P.T.O. selector valve, P.T.O. pedal and pedal lock".
• Make proper use of the general attachments following
the handling instructions in the operation manual provid-
ed by the manufacturer of the general attachments.
13-22-4. Long-term storage
If the hydraulic tool is not used, do the followings:
• Close the stop valves.
• Disconnect the hoses for the hydraulic tool. Wind the
screw plug R (PT) 3/4 with seal tape and tighten them to
the stop valve.
Operating the P.T.O. pedal when the breaker or general at-
tachment is not mounted may cause overheating.
13-22-5. Specification
Hydraulic oil pressure specification
• Oil flow rate : 8.1 GPM (30.8 L / min)
020361-00E
Double acting P.T.O.
Lock
Screw plug R (PT) 3/4
Содержание Z17 GEN:2
Страница 28: ...MEMO 1 16 Courtesy of Machine Market...
Страница 40: ...MEMO 1 28 Courtesy of Machine Market...
Страница 41: ...2 1 OPERATION Courtesy of Machine Market...
Страница 128: ...MEMO 2 88 Courtesy of Machine Market...
Страница 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Страница 188: ...MEMO 3 60 Courtesy of Machine Market...
Страница 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Страница 192: ...MEMO 4 4 Courtesy of Machine Market...
Страница 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Страница 196: ...MEMO 5 4 Courtesy of Machine Market...
Страница 197: ...6 1 NOTES Courtesy of Machine Market...
Страница 198: ...6 2 28 Maintenance Log Maintenance log Date Machine hours Service performed Courtesy of Machine Market...
Страница 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Страница 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Страница 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Страница 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Страница 203: ...29 Notes 6 7 Courtesy of Machine Market...
Страница 204: ...29 Notes 6 8 Courtesy of Machine Market...
Страница 205: ...29 Notes 6 9 Courtesy of Machine Market...
Страница 206: ...MEMO 6 10 Courtesy of Machine Market...
Страница 207: ...Courtesy of Machine Market...