12. Description of Control Devices
2-12
(8) Track gauge change control lever
Use this lever to widen or narrow the track gauge for prop-
er work posture.
(A) : To widen the track gauge, push the lever forward.
(B) : To narrow the track gauge, pull the lever back.
(9) P.T.O. pedal
Use this pedal to control the attachment.
Refer to Section "13-22. Handling hydraulic P.T.O.".
(10) Boom swing pedal
Use this pedal to swing the boom to right and left.
(A) : Swing right : move to the right
(B) : Swing left : move to the left
N (Neutral) : When released, the pedal will return to the
neutral position and the boom is held as it is.
• Be sure to operate the track gauge change con-
trol lever at middle engine speed to avoid hazard.
• When operating the track gauge change, the
crawlers move widthwise. Be sure to operate it
from the operator’s seat only to prevent your
body from being caught between the crawler and
the upper structure or between the crawler and
nearby obstacles.
• For the procedure for changing the track gauge,
refer to Section “13-9. Operating the track gauge
change”.
(A)
(B)
020215-00X
(A)
P.T.O. pedal
(B)
N
(A)
(B)
N
000346-00X
Содержание Z17 GEN:2
Страница 28: ...MEMO 1 16 Courtesy of Machine Market...
Страница 40: ...MEMO 1 28 Courtesy of Machine Market...
Страница 41: ...2 1 OPERATION Courtesy of Machine Market...
Страница 128: ...MEMO 2 88 Courtesy of Machine Market...
Страница 129: ...3 1 MAINTENANCE Courtesy of Machine Market...
Страница 188: ...MEMO 3 60 Courtesy of Machine Market...
Страница 189: ...4 1 SPECIFICATIONS AND DIMENSIONAL DIAGRAMS Courtesy of Machine Market...
Страница 192: ...MEMO 4 4 Courtesy of Machine Market...
Страница 193: ...5 1 OPTIONAL PARTS AND ATTACHMENTS Courtesy of Machine Market...
Страница 196: ...MEMO 5 4 Courtesy of Machine Market...
Страница 197: ...6 1 NOTES Courtesy of Machine Market...
Страница 198: ...6 2 28 Maintenance Log Maintenance log Date Machine hours Service performed Courtesy of Machine Market...
Страница 199: ...28 Maintenance Log 6 3 Date Machine hours Service performed Courtesy of Machine Market...
Страница 200: ...28 Maintenance Log 6 4 Date Machine hours Service performed Courtesy of Machine Market...
Страница 201: ...28 Maintenance Log 6 5 Date Machine hours Service performed Courtesy of Machine Market...
Страница 202: ...6 6 29 Notes Notes Courtesy of Machine Market...
Страница 203: ...29 Notes 6 7 Courtesy of Machine Market...
Страница 204: ...29 Notes 6 8 Courtesy of Machine Market...
Страница 205: ...29 Notes 6 9 Courtesy of Machine Market...
Страница 206: ...MEMO 6 10 Courtesy of Machine Market...
Страница 207: ...Courtesy of Machine Market...