GEDA
®
3700 Z/ZP
Assembly
ML034 GB 2017 / 11
Page 33 of 60
Assembly Instructions
6.7.3
Connecting / switching on the electrical components
Ground station switch box
Assemble the ground station switch box in
the foot section.
1 = Main switch
2 = Ground control
Insert the flat cable plug from the
cable box into the plug
connection (5).
Connect the ground control to the
blue 7-pole socket (3).
During assembly, connect the red
dummy plug to the 7-pole red
socket (4).
Connect the plug for the setting
mechanism (on the base mast) to
the plug-in device (6).
Connect the mains supply line (7)
to the mains network (building
site main distributor).
Insert the flat cable coupling from
the cable bracket (9) on the plug
connection (8) under the left
platform switch box.
5
3
4
7
8
9
6
2
1