GEDA
®
3700 Z/ZP
Dismantling (disassembly)
ML034 GB 2017 / 11
Page 59 of 60
Assembly Instructions
7
Dismantling (disassembly)
For disassembly, the same regulations and safety instructions are
applicable as described in Chapter 6.
Disassembly is generally carried out in reverse order to installation; in
addition, also observe:
•
Disassemble the landing level safety gate first.
•
Then check whether all mast connection bolts are in engaged.
•
The platform must be stopped so that the mast connection to the mast
to be removed is located above the upper edge of the trolley.
•
Only release the mast ties when there are no more mast sections above
the anchor point.
•
Always intermittently unload the platform.