For persons authorised to carry out assembly tasks
GEDA
®
3700 Z/ZP
Assembly Instructions
Page 8 of 60
ML034 GB 2017 / 11
3.4
Set up and connection/assembly
•
Precautionary measures stipulated by the company for avoiding fires,
explosions, dust, gas, steam and smoke (during welding, burning and
grinding work) must be observed.
•
Personnel must be acquainted with the on-site working environment,
e.g. obstacles in the work and traffic areas, ground load bearing
capacity and necessary barriers between the construction site and
public areas.
•
Appropriate lifting gear must be used when working with heavy parts.
•
Adhere to the minimum requirements for thoroughfares, paths and
emergency exits.
•
Provide sufficient space to open gates and covers.
•
Welding, burning and grinding work on the machine must only be
carried out following consultation with and approval from GEDA.
•
Make sure that the masonry is capable of absorbing the tie forces.
A construction expert must check to ensure the house front is suitable
for tie forces of this kind. The inspection results will determine whether
plugs/dowels or through bolts must be used.
•
In the event of wind speeds ≥
45 km/h, bring the car down to the ground
and cease operation.
3.5
Initial operation/daily operation
Ensure that:
•
All safety covers and safety equipment are present and functioning.
•
All connections are correctly connected.
•
All parts are correctly installed.
•
No tools or other parts are inside or on the machine.
•
No tools or other parts are located in the path of travel of the machine.
•
All warning signs and instructions on the machine are present and
complete, clearly visible and undamaged.
•
Illegible or missing warning signs and instructions must be replaced
immediately.
•
Before operation, carry out the checks stipulated in the national
regulations.