Assembly
GEDA
®
3700 Z/ZP
Assembly Instructions
Page 34 of 60
ML034 GB 2017 / 11
After assembly
Operation
without
ground base enclosure with barrier
Connect the supply line for first level control to the 7-pole red socket (4).
Operation
with
ground base enclosure with barrier
Plug the 7-pole, red plug of the limit switch (barrier) into the 7-pole, red
socket (4).
Plug the supply line of the landing gate’s first electrical module into the
7-pole, red coupling of the barrier.
Controls at the landings (option)
(after assembly of the landing level safety gates)
The electric module must be installed on the landing level equipment when
local regulations specify electrical monitoring of the landing level safety
gate or control of an upper stop is required.
Control from the stop is only possible in operating mode
“construction hoist” and only above the initial 2 m safety height.
Additional equipment:
Extension cable 20 m
Assembly
Install the electric module on the sliding door
mounting of the landing level equipment and
attach with the wing nut (12).
The supply line (11) [7-pole plug, red] from
the first electric module is connected to the
ground station at the switch box.
If there are several levels with electric modules, the supply line (11)
[7-pole plug, red] from the second level is connected to the socket (10)
of the electric module below.
The dummy plug is always changed over from the ground-station
switch box to the top landing control.
12
10
11