18
2016-01 · Válvula de retenção de pressão DHV / Constant pressure Valve DHV
Cleaning Effect
The cleaning effect depends on the following factors:
• Temperature
• Time
• Mechanics
• Chemicals
• Degree of soiling
These factors can be combined in such a way as to make
an optimal cleaning result probable. Depending on the
cleaning method (medium, concentration, temperature
and contact times), the seals are affected to different
degrees. This can impair the function and the service
life.
Passivation
Before commissioning a plant, passivation is commonly
carried out for long pipes and tanks.
Valve blocks are usually excepted from this. Passivation
is typically performed using nitric acid (HNO
3
) at
approx. 80 °C (176 °F) at a concentration of 3 % and a
contact time of 6 to 8 hours.
Sucesso da limpeza
O sucesso da limpeza depende dos seguintes fatores:
• Temperatura
• Tempo
• Mecânica
• Química
• Grau de sujeira
A partir destes fatores poderão ser formadas várias com-
binações que tornam possível um sucesso aceitável da
limpeza. Dependendo do método de limpeza (fluido,
concentração, temperatura e tempos de contato), as
vedações são agredidas em diferentes graus. Isso poderá
causar prejuízos no funcionamento e na vida útil.
Passivação
Antes da colocação em funcionamento de uma
instalação é realizada, normalmente, uma passivação em
tubulações longas e tanques.
Por regra, os blocos de válvulas não são abrangidos. A
mesma é realizada, geralmente, com ácido nítrico
(HNO
3
) a aprox. 80 °C (176 °F) com uma concentração
de 3% e um tempo de contato entre 6 a 8 horas.
Содержание DHV DN65/50 KVS 16
Страница 2: ...2016 01 V lvula de reten o de press o DHV Constant pressure Valve DHV...
Страница 29: ......
Страница 32: ......