GE
RAFT
V
OLUSON
™ P8/V
OLUSON
™P6
DIRECTION 5775469, R
EVISION
3
DRAFT (J
ULY
19, 2018)
B
ASIC
S
ERVICE
M
ANUAL
8-128
Section 8-41 - Replacement of the DPS/DPS with Battery
8-41-4
Removal Procedure
1.) Draw the DPS out of the Nest Frame.
8-41-5
Installation Procedure
1.) Install the new parts in the reverse order of removal.
2.) Perform:
FRU8-28: Replacement of the DPS/DPS with Battery - Functional Tests.
Figure 8-186 DPS
Figure 8-187 Drawing the DPS
DPS