GE Reason Switches
Industrial Managed Ethernet Switches
Chapter 2: Safety Information
This chapter provides information about the safe handling of the equipment. The
equipment must be properly installed and handled in order to maintain it in a safe
condition and to keep personnel safe at all times. You must be familiar with
information contained in this chapter before unpacking, installing, commissioning, or
servicing the equipment.
1
Health and Safety
Personnel associated with the equipment must be familiar with the contents of this
Safety Information.
When electrical equipment is in operation, dangerous voltages are present in certain
parts of the equipment. Improper use of the equipment and failure to observe
warning notices will endanger personnel.
Only qualified personnel may work on or operate the equipment. Qualified personnel
are individuals who are:
familiar with the installation, commissioning, and operation of the
equipment and the system to which it is being connected.
familiar with accepted safety engineering practises and are authorised to
energise and de-energise equipment in the correct manner.
trained in the care and use of safety apparatus in accordance with safety
engineering practises
trained in emergency procedures (first aid).
The documentation provides instructions for installing, commissioning and operating
the equipment. It cannot, however cover all conceivable circumstances. In the event
Содержание T1000
Страница 2: ......
Страница 11: ...Figure 97 T1000 dimensions 298 Figure 98 S2020 and S2024G dimensions 299...
Страница 12: ......
Страница 41: ...Chapter 3 Hardware Design GE Reason Switches REASON SWITCHES TM EN 3 41 Figure 4 S2024G Switch...
Страница 103: ...GE Reason Switches Chapter 4 Functions REASON SWITCHES TM EN 3 103 Figure 64 Data Monitor Flow Network...
Страница 256: ......
Страница 274: ......