B.5.2 Example of Boiler File
Boiler “Unit 3”, Section “B” with 141 vertical tubes should be examined every meter in the range between 202 m and 208 m. The thickness
of each tube has to be checked at 3 points (Left, Center, Right).
Figure 37: Boiler File Example
T ube #:
118
119
120
121
E LE V A T IO N 202
L
R
C
File Name UNIT 3/SECT B
Elevation: 202 m ••• 208 m
Tube: 1 ••• 141 1 ••• 141
Point L L L L
C C C C
R R R R