![GE AxiChrom 100 Скачать руководство пользователя страница 139](http://html.mh-extra.com/html/ge/axichrom-100/axichrom-100_operating-instructions-manual_128028139.webp)
11 Continue to tighten the bolts crosswise, increasing the torque successively to 4.0
Nm.
12 Check that it is possible to move the top and bottom centering tool in and out of the
column when mounted.
Replacing tie bars
The following setup assumes that the bottom flange and column tube have been removed
from the column tube assembly (see Servicing the column tube assembly, on page 136).
1
Use a wrench to loosen and unscrew the damaged tie bar(s) [901] connected to the
top bayonet [804].
2
Screw in a new tie bar to one of the tie bar holes by hand and tighten using a wrench
at the key handles.
One of the ends of each tie bar has a short flattened length before the
thread. This flattened end should be used to screw into the top bayonet.
Note:
3
Repeat for other tie bars as appropriate.
4
Continue reassembly of the column (see Servicing the column tube assembly, on
page 136).
AxiChrom 50, 70 and 100 columns Operating instructions 28-9331-08 AG
139
6 Maintenance and service
6.2 Performing maintenance and service