WARNING
•
Fraction collector. Do not fractionate flammable liquids in the
built-in fraction collector. When running RPC methods, collect
fractions through the outlet valve or the optional external
Fraction collector F9-R.
•
RPC runs with 100% acetonitrile and system pressure above
5 MPa (50 bar) in ÄKTA avant 25. Always replace the green
PEEK tubing between the used system pump and the pump
pressure monitor with orange PEEK tubing, i.d. 0.5 mm, before
running RPC with 100% acetonitrile. Set the system pressure
alarm to 10 MPa (100 bar).
•
RPC runs with 100% acetonitrile in ÄKTA avant 150. Always
replace the beige PEEK tubing between the used system pump
and the pump pressure monitor before running RPC with 100%
acetonitrile. Replace it with green PEEK tubing, i.d. 0.75 mm.
Installing and moving
WARNING
To avoid injury when installing and moving the ÄKTA avant
system, take the following measures for personal protection.
•
Move transport crates. Make sure that the lifting equipment
has the capacity to safely lift the crate weight. Make sure that
the crate is properly balanced so that it will not accidentally
tip when moved.
•
Heavy object. The ÄKTA avant instrument weighs about 116
kg. Use proper lifting equipment, or use four or more persons
when moving the instrument. All lifting and moving must be
performed in accordance with local regulations.
•
Moving the product horizontally. Three people are required
to move the product horizontally.
•
Supply voltage. Before connecting the power cord, make sure
that the supply voltage at the wall outlet corresponds to the
marking on the instrument.
•
Protective ground. The product must always be connected
to a grounded power outlet.
ÄKTA avant Operating Instructions 29101556 AB
21
2 Safety Instructions
2.1 Safety Precautions