Purge System Pump A
Purge both pump heads of System Pump A by following the same procedure as in
, but replace step 3 and 4 with the following:
Action
Step
In the Process Picture:
1
•
Click the Inlet valve A icon.
•
Click the position of one of the inlets that will be used at the beginning
of the run.
Result: The inlet valve switches to the selected port.
In the Process Picture:
2
•
Click the System pumps icon.
•
Set Conc % B to 0% B and click Set % B.
Result: Only System Pump A is active.
ÄKTA avant Operating Instructions 29101556 AB
91
4 Installation
4.5 Prime inlets and purge pump heads
4.5.1 Prime buffer inlets and purge system pumps