ZP3 Fire Control Panel Installation, Commissioning and Maintenance Manual
REV 11 (ISS 08/03/2010)
Page 35
Storing the door assembly
The door assembly may be stored until required in the packing carton provided. Re-pack as
shown in Figure 28, making sure that the door hinges are placed in the cut-out provided.
Figure 28: Storing the door assembly
Storing the main chassis
See Figure 29. The main chassis assembly may be stored until required in the packing carton
provided. The chassis should be re-packaged by wrapping in a protective wrap (such as bubble-
wrap), and then placed in the main panel carton.
Figure 29: Storing the main chassis
Содержание ZP3
Страница 1: ...GE Security ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual ...
Страница 44: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 32 REV 11 ISS 08 03 2010 ...
Страница 56: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 44 REV 11 ISS 08 03 2010 ...
Страница 142: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 130 REV 11 ISS 08 03 2010 ...
Страница 143: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual REV 11 ISS 08 03 2010 Page 131 ...
Страница 144: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 132 REV 11 ISS 08 03 2010 ...