ZP3 Fire Control Panel Installation, Commissioning and Maintenance Manual
REV 11 (ISS 08/03/2010)
Page 13
Door assembly
Figure 7 shows all the main features of the ZP3 panel Door Assembly. This unit comprises the
panel display and control electronics as well as the keyboard, a serial connection for data
loading, and the printer (if fitted).
Figure 7: ZP3 Fire Control Panel - Door Assembly
Legend
Item Description
Item Description
1
Display board
4
Earth straps
2 Zone
board
5 Commissioning
board
3 Optional
printer
Remove the complete door assembly if required as follows:
1. Remove two (2) screws securing the hinges.
2. Remove the four (4) nuts securing the earth straps, which connect from door to box.
3. Carefully unplug cables connecting the door boards to the main chassis.
Note:
Do not dismantle the door boards. There are no field serviceable parts in the assembly.
Содержание ZP3
Страница 1: ...GE Security ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual ...
Страница 44: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 32 REV 11 ISS 08 03 2010 ...
Страница 56: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 44 REV 11 ISS 08 03 2010 ...
Страница 142: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 130 REV 11 ISS 08 03 2010 ...
Страница 143: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual REV 11 ISS 08 03 2010 Page 131 ...
Страница 144: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 132 REV 11 ISS 08 03 2010 ...