ZP3 Fire Control Panel Installation, Commissioning and Maintenance Manual
REV 11 (ISS 08/03/2010)
Page 33
Chapter 2: Installing the ZP3 fire control
panel
Packing/unpacking
The ZP3 panel is shipped with the panel fully assembled. As only the panel back-box is normally
mounted during the installation, it is intended that the door assembly and main chassis are
removed before the cabinet is sent to site for electrical installation.
Extra cartons are included with the packaging for re-packing the door assembly and chassis.
These may then be stored until required for commissioning.
The panel packaging is shown in Figure 26.
Figure 26: ZP3 Panel packing/unpacking
Содержание ZP3
Страница 1: ...GE Security ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual ...
Страница 44: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 32 REV 11 ISS 08 03 2010 ...
Страница 56: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 44 REV 11 ISS 08 03 2010 ...
Страница 142: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 130 REV 11 ISS 08 03 2010 ...
Страница 143: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual REV 11 ISS 08 03 2010 Page 131 ...
Страница 144: ...ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual Page 132 REV 11 ISS 08 03 2010 ...