INST
ALLA
TION
49
PULSE Installation, Commissioning and Servicing Manual - Revision 19
7.6 LPG Trade Measurement Verification Process - Version 1.11
1. Before commencing this procedure, check that the two meter housing covers are
secured in place with wire/lead seals.
2. If the seals are not in place, then remove the large cover to inspect the dipswitch
settings. You will be opening a flameproof enclosure, so ensure the dispenser power
is off and be careful not to damage threads or mating faces.
Service
Connector
Statu
s
LED
=
V
olume
Correction
OFF
=
V
olume
Correctio
n
ON
=
Fact
.
Sett.
All
Parameter
=
Fact
.
Sett.
Com.
Para.
=
Security
ON
=
Security
OFF
3
4
1
2
Service
Connector
Status
LED
=
V
olume
Correction
OFF
=
V
olume
Correction
ON
=
Fact
.
Sett
.
All
Parameter
=
Fact
.
Sett
.
Com
.
Para.
=
Security
ON
=
Security
OFF
Service
Connector
Status
LED
=
V
olume
Correctio
n
OFF
=
V
olum
e
Correction
ON
=
Fact
.
Sett
.
All
Parameter
=
Fact
.
Sett
.
Com
.
Para.
=
Security
ON
=
Security
OFF
3
4
1
2
ON
OFF
Figure 22� Location of Dipswitches
3. The dipswitches must be in these positions.
Do not move switches unless advised to by Gallagher technical staff. If moved,
essential settings will be lost needing specialist tools to reset.
4. Replace the meter cover before re-powering the dispenser.
5. If the dispenser is online to the point of sale system, then disable the pump comms
and put the dispenser in stand-alone mode (see Servicing - Section 12.12).
6. Put the dispenser in verification mode by going into Service Mode, using the FILL
key and password (see Servicing - Section 12.1).
7. Using the 2 or 8 keys, scroll to STACK 1000.
$
L
$
L