PULSE Installation, Commissioning and Servicing Manual - Revision 19
2
SAFETY INSPECTION
Before the fuel and electrical supply are turned on for the first time the installation must
be inspected and approved for safety by suitably qualified and competent personnel.
Items that must be checked during safety tests include:
(a) VR return line connections (where present).
(b) Electrical power supply connections.
(c) Remote relay connections (where present).
(d) Communications cabling and connections.
(e) Fuel feed line connections.
3
SYSTEM START-UP CHECKS
On start-up, the dispenser performs various operations and self checks. The results of
these checks are not communicated audibly and may not be confirmed visually on the
displays.
In normal circumstances the dispenser will start without messages.
In the event that an error message is displayed, or if the dispenser does not start up, refer
to Part D Servicing - Section 17 TROUBLESHOOTING.
Contact the appropriate technical department or Gallagher Support.
4
LPG TRADE MEASUREMENT VERIFICATION PROCESS
Refer to Commissioning - Sections 7.6 (v1.11) and 7.7 (v1.20) LPG Trade Measurement
Verification Process, for details regarding this procedure.
5
SERVICE MODE SETTINGS
Certain actions and settings must be completed before the dispenser can be put into
service.
Instructions can be found in Part D Servicing - Section 12 SERVICE MODE FUNCTIONS
(v1.11) or Section 13 for v1.20.
All are carried out at the UI and keypad while in Service Mode.