Returning the Server to Operation
181
Related Information
■
“Reinstall the Server in the Rack” on page 178
■
“Connect Power Cords to the Server” on page 181
■
“Power On the Server Using the
■
“Power On the Server Using the Front Panel Power Button” on page 182
▼
Connect Power Cords to the Server
●
Reconnect both power cords to the power supplies.
Note –
As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured, the system might boot at this time.
Related Information
■
“Power On the Server Using the
■
“Power On the Server Using the Front Panel Power Button” on page 182
▼
Power On the Server Using the
poweron
Command
Note –
If you are powering on the server following an emergency shutdown that
was triggered by the top cover interlock switch, you must use the
poweron
command.
Содержание SPARC Enterprise T5140
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 44: ...18 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 FIGURE Diagnostics Flowchart ...
Страница 82: ...56 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 ...
Страница 154: ...128 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 ...
Страница 234: ...208 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 ...
Страница 239: ......
Страница 240: ......