CHAPTER 4
ETSI Configuration
Connecting and Checking Office Battery to the PDP
4-23
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
10
Repeat
, substituting A2 for A1, then B1 for A1, and
finally B2 for A1.
11
Connect the frame ground lead to the FG terminal located at the top of the PDP. See
Note:
This grounding procedure assumes that the frame ground and power ground are terminated at
a central ground bus (ground window). Refer to Telcordia TR-TSY-000513.
12
Verify that no strands of wire are shorting terminals together and that leads are securely
fastened.
13
Replace the plastic cover over the input connectors.
14
On the front panel of the PDP, remove fuses A1-1 through B2-2.
15
Observing local procedures, connect each of the power cables to the office batteries and office
ground as appropriate.
This procedure is complete.
Revision 1, June 2009
Содержание FLASHWAVE 7500
Страница 8: ...Revision 1 June 2009 ...
Страница 10: ...Revision 1 June 2009 ...
Страница 16: ...Revision 1 June 2009 ...
Страница 362: ...Revision 1 June 2009 ...
Страница 386: ...Revision 1 June 2009 ...