CHAPTER 4
ETSI Configuration
Installing Power and Ground Cables
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-62
Fujitsu and Fujitsu Customer Use Only
4.13
Installing Power and
G
round Cables
This procedure provides instructions for installing power, ground, and alarm cabling for
standard rack configurations.
N
O
.
S
UBPROCEDURE
P
A
G
E
It includes the following subprocedures:
P
r
o
c
e
d
u
r
e
4.13.1
Reference Material
This subsection describes instructions for installing power and ground cabling for ETSI rack
configurations. Fujitsu does not manufacture a power distribution panel (PDP) for ETSI
applications. Fujitsu recommends using the ADC # PWX-1LFA2DF fuse panel
manufactured by ADC Telecommunications, Inc. Refer to ADC documentation supplied
with the product for installation instructions for the ADC # PWX-1LFA2DF fuse panel. This
unit can be ordered through Fujitsu using part number PC15L-0001-C083#01.
The cables and cable harnesses used are listed in
and shown in
.
Note:
Connections to the shelf power terminal strip should use copper conductors only.
show schematics for installing power and
ground cabling between the rack, shelves and PDP for the following standard rack
configurations:
Each standard rack configuration includes a PDP with power terminals as shown in
.
Revision 1, June 2009
Содержание FLASHWAVE 7500
Страница 8: ...Revision 1 June 2009 ...
Страница 10: ...Revision 1 June 2009 ...
Страница 16: ...Revision 1 June 2009 ...
Страница 362: ...Revision 1 June 2009 ...
Страница 386: ...Revision 1 June 2009 ...