CHAPTER 3
Small Configuration
Installing Power, Ground, and Alarm Cables
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
3-100
Fujitsu and Fujitsu Customer Use Only
27
Prepare the power leads by installing the terminal lugs (wrapped in a plastic bag shipped with
the cable) that are required on one end of the cable (see
). Ensure that no
wire strands are shorting terminals together and that leads are securely fastened. The cable
should now have terminal lugs on both ends of the power cable.
Note:
The shelf power wiring is the same with all rack configurations. Observe the color coding of the
power cable.
28
On the backplane of the shelf identified in
, remove the plastic cover on the
shelf power terminal strip located on the bottom right of the shelf backplane (see
).
29
Connect both ends of cable GA of the power harness as follows:
a.
Identify lug GA in the power harness (see
) and connect it to shelf
b.
Connect the other end of the same cable to CBP terminal RTN A1 CB3 (see
).
30
Connect both ends of cable GB of the power harness as follows:
a.
Identify lug GB in the power harness (see
).
b.
Connect the other end of the same cable to CBP terminal RTN B1 CB3 (see
).
31
Connect both ends of cable MA of the power harness as follows:
a.
Identify lug MA in the power harness (see
) and connect it to shelf
terminal MAIN A (see
).
b.
Connect the other end of the same cable to CBP terminal BATT A1 CB3 (see
).
32
Connect both ends of cable MB of the power harness as follows:
a.
Identify lug MB in the power harness (see
terminal MAIN B (see
b.
Connect the other end of the same cable to CBP terminal BATT B1 CB3 (see
).
Revision 1, June 2009
Содержание FLASHWAVE 7500
Страница 8: ...Revision 1 June 2009 ...
Страница 10: ...Revision 1 June 2009 ...
Страница 16: ...Revision 1 June 2009 ...
Страница 362: ...Revision 1 June 2009 ...
Страница 386: ...Revision 1 June 2009 ...