39
Installation and First Use
Chapter 7
The FORMULATRIX support team will perform the ROCK IMAGER installation in your laboratory or at
your site; do not do this yourself.
You will receive your instrument via a shipping service in a large crate (two extra crates for chillers
if you purchase the ROCK IMAGER 4°C).
When you receive your shipping crate:
●
Inspect the crate thoroughly for any signs of damage. If you find damage, take pictures and
contact FORMULATRIX and the shipping provider.
●
Make sure the ShockWatch sticker is not red (if tripped, the center turns red as shown in the
image at right below).
FORMULATRIX support will have sent you an email with crate dimensions. Please ensure that you
have ample space in a dry area away from extreme temperatures to store ROCK IMAGER until support
arrives to begin installation. Make sure that the “This Side Up” sticker always points upwards. You will
need sturdy moving tools, such as a forklift, if you want to move the shipping crate.
Shockwatch Labels
Only FORMULATRIX personnel should perform transportation, installation, wiring,
inspection, and upgrade procedures, otherwise you may be injured and/or fire
may occur.