![Fluke PG9000 Series Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/fluke/pg9000-series/pg9000-series_operation-and-maintenance-manual_2309961032.webp)
PG9602™ OPERATION AND MAINTENANCE MANUAL
© 2011 Fluke Calibration
Page
22
To install the AMH mass set, follow the order of operation:
Prepare the masses:
Open the shipping cases and take inventory of the
masses. Remove the mass elements from their plastic bags only when
required to load them on the PG Base.
Install a piston-cylinder module in the PG9000 Platform:
See Section
Install the binary mass carrier:
Place the pyramidal shaped carrier on top
of the piston cap.
Install the mass loading bell:
Slide the mass loading bell over the binary
mass carrier and slide it down until the inside top of the bell sits on the binary
mass carrier.
Install the main mass discs:
Load the 10 kg main mass discs onto the
mass bell
starting with mass #1 and loading in sequential order
. Mass
#1 must be at the bottom of the stack and the highest sequenced number
mass at the top. The mass sequence numbers are laser marked on the top
surface of each mass.
Install the binary mass tubes:
Load the binary mass tubes from the largest
to smallest. The largest, long tubes slip down between the main mass stack
and the bell. The smaller masses load onto the pyramidal steps of the binary
mass carrier.
The mass loading process is mostly complete:
The mass set is in the all
loaded position, but do not yet install the mass lifting shaft assembly. It will
be installed later after the AMH is installed over the masses on the platform
(see Section 3.7.2.1).
Create the mass set and mass loading bell in the PG Terminal:
If a mass
set was ordered from the factory as part of a PG9000 system then the mass
set data is preloaded into the PG9000 memory, and there is no need to
create a mass set definition. See Sections 3.12.1.6 and 3.12.1.11 if a mass
set definition must be created.
2.3.1.5
Setting Up An AMH Automated Mass Handler
(optional)
The setup of the AMH can be broken down into 3 steps:
Connect the drive air supply (see Section 2.3.1.5.1)
Connect the drive vacuum supply (see Section 2.3.1.5.2)
Connect the AMH communications (see Section 2.3.1.5.3)
2.3.1.5.1
Connecting AMH Drive
The AMH accessories kit includes hardware to facilitate the connection of the
drive air supply (see Table 4. AHM-100-VAC Parts List). Locate the drive air
connection accessories including:
•
Quick-connector stem (DESO type with red band).
•
2 meters pf 1/8 inch O.D., clear PFA tubing.
•
1/8 inch Swagelok
®
tube connector x 1/4 inch NPT male adaptor.
Содержание PG9000 Series
Страница 10: ...PG9602 OPERATION AND MAINTENANCE MANUAL 2011 Fluke Calibration Page X Notes...
Страница 128: ...PG9602 OPERATION AND MAINTENANCE MANUAL 2011 Fluke Calibration Page 118 Notes...
Страница 164: ...PG9602 OPERATION AND MAINTENANCE MANUAL 2011 Fluke Calibration Page 154 Notes...
Страница 188: ...PG9602 OPERATION AND MAINTENANCE MANUAL 2011 Fluke Calibration Page 178 Notes...
Страница 192: ...PG9602 OPERATION AND MAINTENANCE MANUAL 2011 Fluke Calibration Page 182 Notes...