![Flavor Burst FB 80INT-08 Скачать руководство пользователя страница 60](http://html1.mh-extra.com/html/flavor-burst/fb-80int-08/fb-80int-08_manual_2303437060.webp)
59
14. Install the plastic plug into the other hole on
the modified Taylor panel. (See Figure 162.)
26414
Figure 162
15. Reinstall the side support bracket. (See
Figure 163.)
26415
Figure 163
16. Install the modified back panel to the Taylor
cabinet and reinstall the side panel to
complete the installation. (See Figure 164.)
26416
Figure 164
Connecting the Unit Syrup Line
The 9-Tube Lead that exits the cabinet panel at
the back connects to the 9-Tube Assembly that
wraps around to the front of the freezer. These
lines connect the 8 bags of syrup and the
sanitizer tank to the Injector Assembly. Follow
these instructions to connect the two tube
assemblies.
1. Locate the 9-Tube Lead at the back of the
cabinet and remove the dust cap. (See
Figure 165.)
26430
Figure 165
2. Align the 9-hole gasket with the coupler pins
of the 9-Tube Lead and place the gasket
against the coupler. Then align the coupler
pins of the two tube assemblies and
connect them. (See Figure 166.)
9-HOLE GASKET
COUPLER PINS
26431
Figure 166
3. Thread the 9-Tube Assembly coupler into
the Lead’s casing and tighten to secure.
(See Figure 167.)
26432
Figure 167
Содержание FB 80INT-08
Страница 4: ...3...
Страница 7: ...6 General System Overview 5 2 1 3 6 7 13 4 26000 10 9 11 12 T 14 MODIFIED BACK PANEL 8 Figure 1...
Страница 14: ...13 PAGE INTENTIONALLY LEFT BLANK...
Страница 21: ...20 Spare Parts Kit 10 12 13 2 6 5 11 7 3 4 1 14 9 15 8 26007 Figure 7...
Страница 22: ...21...
Страница 26: ...25...
Страница 34: ...33...
Страница 66: ...65...
Страница 76: ...75...