CIP - Phase 3: Reassembly
24. Attach a Syrup Bag Adapter to each bag
fitment. The notch of the black collar must
settle into one of the grooves on the fitment
in order to secure the connection. (See
Figure 72.)
NOTCH MUST
SETTLE INTO
GROOVE
26077
Figure 72
25. Turn the adapter valve toward the syrup line
while holding the adapter base. Syrup
lines may be installed in any position as
long as the syrup tubes are not pinched.
(See Figure 73.)
26277
Figure 73
26. Reconnect the syrup lines and bags of
syrup by pressing the Syrup Bag Connector
onto the Syrup Bag Adapter valve. (See
Figure 74.)
26275
Figure 74
27. Remove the Syrup Line Manifold, Manifold
cap, the Duckbill Check Valve, and Coupler
Body from the sanitizer solution and place
on a sanitary tray to air dry. (See
Figure 75.)
26175
Figure 75
28. Install the Duckbill Check Valve into the
Syrup Line Manifold and the Syrup Line
Manifold into the Coupler Body. (See
Figure 76.)
26176
Figure 76
29. Remove the end of the 9-Tube Assembly
from the container. Using a spray bottle of
approved sanitizer solution, spray end of the
assembly and allow it to sanitize for at least
1 minute. (See Figure 77.)
26177
Figure 77
Содержание FB 80INT-08
Страница 4: ...3...
Страница 7: ...6 General System Overview 5 2 1 3 6 7 13 4 26000 10 9 11 12 T 14 MODIFIED BACK PANEL 8 Figure 1...
Страница 14: ...13 PAGE INTENTIONALLY LEFT BLANK...
Страница 21: ...20 Spare Parts Kit 10 12 13 2 6 5 11 7 3 4 1 14 9 15 8 26007 Figure 7...
Страница 22: ...21...
Страница 26: ...25...
Страница 34: ...33...
Страница 66: ...65...
Страница 76: ...75...