M a i n t e n a n c e
62
Model 1010 Ion Mill
Standard Magnification Version
8.
Remove the Swagelok® fitting from the manifold.
9.
Remove the fittings from the defective controller and re-position them in the
appropriate position of the new controller.
10.
Position the new controller on the bracket and connect its inlet to the manifold.
11.
Tighten the Swagelok® fitting finger tight then tighten with a 9/16" wrench 1/4 turn.
12.
Install the two screws that secure the controller to the mounting bracket.
13.
Place the bracket with the flow controllers into the instrument and secure it from
below to the base plate with the three corresponding screws.
14.
Re-connect both the inlet line to the flow controller manifold and the outlet lines to
the ion sources.
15.
Leak check the instrument, both on the pressure and vacuum sides using the
procedure in the following section.
Note: When reconnecting the argon line to the instrument, follow the purge
procedure described on page 11.
Leak Detection
High pressure
To evaluate the instrument for argon leakage on the pressure side:
1.
Turn the Model 1010 power switch to the off position.
WARNING! ELECTRICAL HAZARD. High voltages can cause severe injury or
death. Turn off the instrument. Wait one minute to ensure that any
charged electronic component will discharge before disconnecting
the power cord from the instrument.
2.
Disconnect the power cord.
3.
Close the cylinder valve and observe for a pressure drop.
Fitting
Fitting