M a i n t e n a n c e
59
Model 1010 Ion Mill
Standard Magnification Version
8.
Insert the gauge tube into the bulkhead fitting.
9.
Tighten the bezel nut hand-tight.
10.
Reconnect the electrical connection.
Note: The connector and gauge tube are keyed to ensure that the connector is
installed in the correct orientation.
Bottom plate
The bottom plate contains both the Pirani gauge tube and the laser light detector. Both of
these components may be serviced without removing the bottom plate. However, when a
major cleaning of the chamber is required, the bottom plate should be removed to provide
suitable access to the bottom chamber area.
Remove bottom plate
1.
Remove the light source/photo detector (refer to page 34) and the Pirani gauge tube
(page 58).
CAUTION:
Once the screws holding it are removed, the bottom plate drops
out of the chamber. Be sure to support the bottom plate when
removing the screws to prevent damage.
2.
Remove six socket head cap screws holding the bottom plate.
3.
Remove the o-ring.
4.
Soak and then clean the plate in acetone and allow to dry.
Depending on the amount of sputtered material on the plate surface, it may be
necessary to polish the surface using a fine polishing paste prior to cleaning. Do not
use an ultrasonic cleaner because a vacuum epoxy joint may be degraded.
5.
Carefully inspect the bottom plate for scratches with extra emphasis focusing on the
bore into which the light assembly fits.
6.
If scratches appear on any o-ring sealing surface, remove them and re-clean the plate.