M a i n t e n a n c e
57
Model 1010 Ion Mill
Standard Magnification Version
Note: The water lines are not equipped with check valves, that would prevent
water spillage from the water contained within the alignment flange and water
lines running to the flange.
2.
Repeat this procedure for all four tubes.
Remove flange
1.
Locate the three shoulder screws.
These screws are positioned between the ion source alignment screws.
2.
Remove the three shoulder screws and their springs.
The alignment flange is now free from the chamber.
Install flange
1.
Following the service to the chamber, reinstall the alignment flange to the chamber
with the three shoulder screws.
2.
Be sure to place a compression spring onto each screw prior to insertion into the
alignment flange.
Connect water line
1.
Reconnect the water lines as described on page 12.
CAUTION:
For proper water flow and function of the pressure/flow switch,
the water lines must be connected properly. Failure to do so
could result in overheating of the ion sources.
Shoulder screws