
Maintenance Instructions
22.3.11
Panda PMS 8.000 NE - 42 NE Manual.R05 - Kapitel/Chapter 6: Maintenance Instructions Seite/Page 111
Fig. 6.8.1.3-7: Press in ball bearing
With the other hand, put a screw wrench on the long nut, fasten
slowly.
Thus the ball bearing is pressed onto the shaft.
If necessary hold driving shaft with suitable wrench, to prevent
diesel engine from rotation simultaneously.
Press on ball bearing as far as possible.
(Tool Wrench SW13 and SW 22)
Sample Picture
Fig. 6.8.1.3-8: Hold up the driving shaft
Hold up the driving shaft.
Sample Picture
Fig. 6.8.1.3-9: Remove tools and markings
• Remove tools.
• Remove markings.
• Mount cooling disc (if existent).
• Mount presilencer and circuit points.
• Refill cooling water and vent cooling water circuit (see gene-
rator manual.
• Remove starting lock.
• Reconnect starter battery.
• Run generator 3 to 5 minutes.
• Mount casing.
Sample Picture
Содержание 6500 PMS
Страница 58: ...The Panda Generator Seite Page 58 Panda_6500_7mini_PMS_eng R01 Kapitel Chapter 4 The Panda Generator 22 3 11 ...
Страница 168: ...Seite Page 168 Panda PMS 8 000 NE 42 NE Manual R05 22 3 11 Leere Seite Intentionally blank Generator Faults ...
Страница 214: ...Seite Page 214 Panel Generator Control P6 RE0703_Kunde_eng R06 1 22 3 11 Leere Seite Intentionally blank Measurements ...