4
Commissioning with the FCT
30
Festo – EXCM-30/-40-...-PF-EN – 1603 – English
4
Commissioning with the FCT
Note
A prerequisite for commissioning is completed installation of the planar surface gantry
EXCM-30/-40 and of the controller CMXH (
è
4.1
Safety instructions
Caution
Unexpected movement of the product.
Risk of impact and crushing injuries.
Make sure that an ENABLE signal is not present at the control interfaces when the
controller is switched on.
Parameterise the entire system completely before you activate the output stage.
Make sure that nobody can grasp into the sphere of influence of the planar surface
gantry as well as other connected actuators – e.g. through protective guards – and
no items are located in the travel range as long as the system is connected to energy
sources.
Note
The controller does not execute direct tasks or records if a valid reference point is not
present (exception, jogging).
Always carry out homing after every switch-on or failure of the logic voltage, in order
to anchor the dimension system to the reference point.
Note
Damage to components when the permissible impact pulse is exceeded.
Operate the planar surface gantry only with the maximum permissible load
(
è
Tab. 1.2 Documentation for the system EXCM-30/-40 with CMXH).
Note
Interruption of ongoing tasks due to inadequate load voltage.
Make sure that the tolerance of the load voltage at the input of the controller is
complied with under full load (
è