
Maintenance, 10h
4812164601_C.pdf
2023-01-05
Sprinkler system/Drum
Cleaning of sprinkler nozzle
3
2
Fig. Nozzle
1. Nozzle
2. Gasket
3. Filter
1
Dismantle the blocked nozzle by hand.
Blow the nozzle (1) and fine filter (3) clean using
compressed air. Alternatively, fit replacement parts
and clean the blocked parts later on.
Nozzle
Colour
l/min (at 2.0
bar)
gal/min (at
40 psi)
Nozzle
Colour
l/min (at 2.0
bar)
gal/min (at
40 psi)
Standard
yellow
0.63
0.20
Standard
yellow
0.63
0.20
Option
blue
0.98
0.30
Option
blue
0.98
0.30
Option
red
1.31
0.40
Option
red
1.31
0.40
Option
brown
1.63
0.50
Option
brown
1.63
0.50
After inspecting and carrying out any necessary
cleaning, start the system and check that it works.
Wear protective goggles when working with
compressed air.
Wear protective goggles when working with
compressed air.
Scrapers, fixed
Checking - Setting
Fig. Drum
1. Scraper blade
2. Adjusting screws
3. Mounting plate
3
2
1
Make sure that the scrapers are undamaged. Adjust
the scrapers so that they are 1-2 mm from the drum.
For special asphalt compounds, it may be better if the
scraper blades (1) lie lightly against the drums.
Asphalt remnants can accumulate on the scraper and
affect the contact force. Clean as required.
Loosen the screws (2) to adjust the contact pressure
of the scraper blade against the drum.
Lock this setting by tightening the lock nut (2) against
the mounting plate (3).
Adjust the contact surface
on both scraper attachments.
Remember to tighten all the screws
after any adjustment.
127
Содержание DYNAPAC CC1400C
Страница 2: ......
Страница 16: ...r h 4812164601_C pdf 2023 01 05 ...
Страница 20: ...Introduction 4812164601_C pdf 2023 01 05 4 ...
Страница 30: ...Special instructions 4812164601_C pdf 2023 01 05 14 ...
Страница 54: ...Machine description 4812164601_C pdf 2023 01 05 4812129673 Warning CALIFORNIA Proposition 65 38 ...
Страница 82: ...Machine description 4812164601_C pdf 2023 01 05 66 ...
Страница 98: ...Operation 4812164601_C pdf 2023 01 05 82 ...
Страница 118: ...Operating instructions Summary 4812164601_C pdf 2023 01 05 102 ...
Страница 133: ...Maintenance Maintenance schedule 4812164601_C pdf 2023 01 05 Service Checklist 117 ...
Страница 134: ...Maintenance Maintenance schedule 4812164601_C pdf 2023 01 05 118 ...
Страница 146: ...Maintenance 10h 4812164601_C pdf 2023 01 05 130 ...
Страница 164: ...Maintenance measures 250 h 4812164601_C pdf 2023 01 05 148 ...
Страница 196: ...and Stage V 37 kW and 37 kW Maintenance measures 1500 h only Tier 4f Stage V 28 kW 4812164601_C pdf 2023 01 05 180 ...
Страница 234: ...Maintenance 3000h 4812164601_C pdf 2023 01 05 218 ...
Страница 239: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...